Paging on/off

  View Notes
(Printing Instructions) 

Printer Friendly Version 
The Bureau of Labor Law Compliance updated its Pennsylvania Building Journeyperson Laborer Notes
to clarify existing tasks performed throughout the Commonwealth. The “Building Laborer Notes”
link on the Bureau’s website provides a list of those tasks that should be read in conformity
with custom and usage of the construction industry in the geographic region in which they are utilized.
Project Name: Hill Road Storm Water Sewer Pipe Project 2018
General Description: The Work included in this project is cured-in-place pipe (CIPP) lining. This process begins by cleaning the existing pipeline prior to installation of a new liner which has a smooth interior. The materials used in the installation process include an industrial grade felt tube with an impermeable membrane and a resin which hardens and gives strength to the liner. After installation is complete, curing and hardening of the liner is accomplished by applying heat with hot water or pressurized steam. The result of the CIPP process is that within the existing pipe a new pipe is formed with a generally expected service life of 50 years.
Project Locality: Reading PA
Awarding Agency: City of Reading
Contract Award Date: 1/14/2019
Serial Number: 18-07855
Project Classification: Highway
Determination Date: 12/6/2018
County: Berks
Assigned Field Office: Scranton
Field Office Phone Number: (570)963-4577
Toll Free Phone Number: (877)214-3962


Building
Find:   
 
Search returned 154 record(s)
Contractor CraftHourly RateFringe BenefitsTotalEffective DateExpiration Date
Asbestos & Insulation Workers $32.00 $26.51 $58.51 06/26/2017
Asbestos & Insulation Workers $32.80 $26.76 $59.56 07/02/2018
Asbestos & Insulation Workers $32.80 $28.26 $61.06 07/02/2019
Asbestos & Insulation Workers $32.80 $30.01 $62.81 07/02/2020
Boilermaker (Commercial, Institutional, and Minor Repair Work) $28.52 $18.22 $46.74 03/01/2017
Boilermaker (Commercial, Institutional, and Minor Repair Work) $29.52 $18.22 $47.74 03/01/2018
Boilermakers $46.26 $33.36 $79.62 01/01/2018
Boilermakers $45.89 $33.73 $79.62 03/01/2018
Bricklayer (Pointer, Cleaner, Caulker, Cement Mason, Plasterer, Tile Setter) $29.40 $20.35 $49.75 05/01/2018
Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners $34.11 $15.19 $49.30 05/01/2017
Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners $34.53 $15.57 $50.10 05/01/2018
Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners $35.04 $15.96 $51.00 05/01/2019
Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners $35.64 $16.36 $52.00 05/01/2020
Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners $36.33 $16.77 $53.10 05/01/2021
Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers $30.05 $16.05 $46.10 06/01/2017
Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers $29.53 $16.20 $45.73 06/01/2018
Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers $30.18 $16.65 $46.83 06/01/2019
Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers $30.88 $17.10 $47.98 06/01/2020
Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers $31.77 $17.41 $49.18 06/01/2021
Cement Finishers $35.87 $12.93 $48.80 05/01/2017
12345678




Heavy/Highway
Find:   
 
If you can not find a classification under Heavy/Highway, please refer to the Building classifications
Search returned 167 record(s)
Contractor CraftHourly RateFringe BenefitsTotalEffective DateExpiration Date
Carpenter - Instrument Person (Surveying & Layout) $27.12 $13.83 $40.95 05/01/2016
Carpenter - Rodman I (Survey & Layout) $21.09 $13.83 $34.92 05/01/2016
Carpenter - Rodman II (Survey & Layout) $18.69 $13.83 $32.52 05/01/2016
Carpenters $30.92 $14.14 $45.06 06/01/2017
Cement Finishers $27.70 $20.20 $47.90 01/01/2017
Electric Lineman $44.22 $23.94 $68.16 05/29/2017
Electric Lineman $45.25 $24.94 $70.19 05/28/2018
Electric Lineman $46.32 $25.97 $72.29 05/27/2019
Iron Workers $31.95 $27.65 $59.60 07/01/2106
Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing) $31.33 $28.42 $59.75 07/01/2017
Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing) $32.53 $28.42 $60.95 07/01/2018
Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing) $33.76 $28.42 $62.18 07/01/2019
Laborers (Class 01 - See notes) $19.81 $15.79 $35.60 05/01/2016
Laborers (Class 01 - See notes) $20.36 $16.29 $36.65 05/01/2017
Laborers (Class 01 - See notes) $20.96 $16.79 $37.75 05/01/2018
Laborers (Class 01 - See notes) $21.61 $17.29 $38.90 05/01/2019
Laborers (Class 02 - See notes) $26.43 $15.79 $42.22 05/01/2016
Laborers (Class 02 - See notes) $26.98 $16.29 $43.27 05/01/2017
Laborers (Class 02 - See notes) $27.58 $16.79 $44.37 05/01/2018
Laborers (Class 02 - See notes) $28.23 $17.29 $45.52 05/01/2019
123456789



  
  L&I Home
Bureau of Labor Law Compliance
Labor & Industry Building
Room 1301
651 Boas Street
Harrisburg PA 17121
(717)705-5969
Email: LI, SLMR-LLC